Projects

Projects

Major completed projects

Over 15 years we have fully delivered more than 60 projects nationwide, installing over 50 substations and more than 300 km of overhead transmission lines.

60+Projects completed
50+Substations installed
300 km+Lines constructed
500+Client organisations

Construction

Power construction projects

Tavan Tolgoi–Zuunbayan line

35 kV · Construction

Tavan Tolgoi–Zuunbayan railway double-circuit overhead transmission line

Baganuur–Buurulj line

220 kV · Construction

Baganuur–Buurulj overhead transmission line

Songino–Sergelen line

220 kV · Construction

Songino–Sergelen double-circuit transmission line

Undurkhaan substation

110/35/6 kV · Expansion

Undurkhaan substation expansion to 2×25 MVA

Nalaikh technology park

110/35/10 kV · Power supply

Nalaikh technology park line and 2×16 MVA substation

Central wastewater treatment plant

110/35/10 kV · Substation

Central wastewater treatment plant 2×40 MVA substation

Baruun-Urt substation

110/35/10 kV · Expansion

Baruun-Urt substation, Sukhbaatar province, upgrade to 2×10 MVA

Bayankhongor substation

110/35/10 kV · Expansion

Bayankhongor substation upgrade to 2×16 MVA

Engineering

Selected design projects

220 kV projects

  • Tsagaan Suvarga–Sainshand double-circuit overhead line
  • Baganuur–Nalaikh–Ulaanbaatar line and substation expansions
  • Nalaikh 220/110 kV transit substation and Sergelen–Songino connection
  • Arvaikheer–Kharkhorin line and Avzaga 2×125 MVA substation
110 kV and below

  • Power supply for the Chinggis Khaan complex, Dadal, Khentii
  • 1st Microdistrict 110/10 kV substation, Songinokhairkhan
  • Gachuurt 110/35/10 kV substation and double-circuit line
  • Industrial and residential building electrical design
150+Studies and designs
200+ MVASubstation capacity
1500 km+Lines designed

Ministry of Energy·Ministry of Construction and Urban Development·National Power Dispatching Center·Mongolian Railway·Ulaanbaatar Railway·Khurd Group·MCS Group·Bodi Group·NCD Group·Eco Construction·Baganat Urguu·New Construction·Tsetsens Mining & Energy·
Ministry of Energy·Ministry of Construction and Urban Development·National Power Dispatching Center·Mongolian Railway·Ulaanbaatar Railway·Khurd Group·MCS Group·Bodi Group·NCD Group·Eco Construction·Baganat Urguu·New Construction·Tsetsens Mining & Energy·

Contact

Let’s deliver your project together

VirtualSoft LLC
VirtualSoft LLC

Since 2008 we have delivered construction, feasibility studies and engineering design for power facilities. Operating under ISO 45001.

What we do
  • Transmission line construction
  • Substation installation
  • Testing and commissioning
  • Feasibility and design
  • Electrical supply
Contact

© 2026 VirtualSoft LLC. All rights reserved.
Power construction · Engineering design