We build and commission power infrastructure
Installation, expansion, testing and commissioning of 0.4–220 kV transmission lines and substations since 2008.
From installation to operation
We carry out installation, expansion, testing and commissioning of power facilities with our own qualified team and equipment.
Line and substation construction
Over 15 years we have fully delivered more than 60 projects and connected over 80 MVA of capacity to the grid.
- 0.4–220 kV overhead and cable line installation
- New substations and capacity upgrades
- Equipment replacement and refurbishment
- Testing, commissioning and handover

Indoor systems
- Building power supply and lighting
- Communications, alarm and data networks
- Fire suppression and fire alarm systems
Structural works
- Cast-in-place and precast reinforced concrete
- Timber and masonry structures
- Expansion, refurbishment and landscaping
Ministry of Energy·Ministry of Construction and Urban Development·National Power Dispatching Center·Mongolian Railway·Ulaanbaatar Railway·Khurd Group·MCS Group·Bodi Group·NCD Group·Eco Construction·Tsetsens Mining & Energy·
Selected major projects
Nationwide we have fully delivered more than 60 projects, installing over 50 substations and more than 300 km of overhead transmission lines.
Tavan Tolgoi–Zuunbayan railway double-circuit overhead line
Baganuur–Buurulj overhead transmission line
Songino–Sergelen double-circuit transmission line
Undurkhaan substation expansion to 2×25 MVA
Nalaikh technology park line and 2×16 MVA substation
Central wastewater treatment plant 2×40 MVA substation
Baruun-Urt substation, Sukhbaatar province, upgrade to 2×10 MVA
Bayankhongor province substation expansion to 2×16 MVA
An experienced industry team
Since 2008 VirtualSoft LLC has been building, maintaining and upgrading transmission lines and substations. We work with more than 500 clients and operate under ISO 45001.
- Electrical engineers — 16
- Linemen — 15 · Operators — 9
- Civil engineers — 4
- Surveying engineer — 1 · Telecom engineer — 1
- Administrative staff — 5
- Certified consulting engineers — 8
- Senior engineers — 3
- Lead cost estimators — 2 · Certified cost estimators — 4
- HSE officers — 2

- Administration and HR
- Technical policy and R&D
- Finance · Project coordination
- Installation and repair · Quality control · HSE
Company founded; transmission line and substation installation and repair operations began
Founded
Acquired Stroika LLC and commissioned an aerated and reinforced concrete plant
Manufacturing
Introduced the ISO 45001 occupational health and safety management system
Standard
Fully licensed
Installation, repair, testing and commissioning of 0.4–220 kV and higher transmission lines and substations
Ministry of Energy
Installation of transmission networks, substations and related equipment
Ministry of Construction
Construction, expansion and refurbishment of reinforced concrete, timber and masonry structures
Ministry of Construction
Indoor lighting, power supply, communications, alarm and fire suppression systems
Ministry of Construction
Building repair, interior finishing and landscaping
Ministry of Construction
International occupational health and safety management system
Since 2018
Let’s talk about your project
We will prepare a preliminary estimate of scope, schedule and budget. Send tender invitations, partnership proposals or job applications by email.