

We design and build power infrastructure
From feasibility studies and engineering design to installation, testing and commissioning of 0.4–220 kV transmission lines and substations — all under one roof.
From design to operation
One team handles both construction and engineering design of power facilities, keeping schedule and accountability in a single place.
Power facility construction
New construction, expansion, refurbishment, testing and commissioning of substations and transmission lines.
- 0.4–220 kV overhead and cable lines
- Substation installation and capacity upgrades
- Building electrical supply and lighting
- Fire suppression and alarm systems
Total capacity connected to the grid

Feasibility studies and design
Over 150 engineering designs delivered in 10 years through our design division.
- Overhead lines and fibre-optic communication lines
- Substations, outdoor and indoor switchgear
- Power system stability and short-circuit studies
- Model Studio CS · EnergyCS · RChain CS
Ministry of Energy·Ministry of Construction and Urban Development·National Power Dispatching Center·Mongolian Railway·Ulaanbaatar Railway·Khurd Group·MCS Group·Bodi Group·NCD Group·Eco Construction·Tsetsens Mining & Energy·
Selected major projects
Tavan Tolgoi–Zuunbayan railway double-circuit overhead line
Baganuur–Buurulj overhead transmission line
Songino–Sergelen double-circuit transmission line
Undurkhaan substation expansion to 2×25 MVA
Nalaikh technology park line and substation
Central wastewater treatment plant 2×40 MVA substation
An experienced industry team
Since our founding in 2008 we have been building, maintaining and upgrading transmission lines and substations. We work with more than 500 clients and operate under ISO 45001.
- 2008 — Company founded; construction operations began
- 2013 — Engineering design division established
- 2018 — Aerated and reinforced concrete plant commissioned
- 2018 — ISO 45001 management system introduced
- Electrical engineers — 16
- Linemen — 15 · Operators — 9
- Civil engineers — 4
- Senior engineers — 3 · Cost estimators — 6
Fully licensed
Installation, repair, testing and commissioning of 0.4–220 kV and higher transmission lines and substations
Ministry of Energy
Installation of transmission networks, substations and related equipment
Ministry of Construction
Construction, expansion and refurbishment of reinforced concrete, timber and masonry structures
Ministry of Construction
Indoor lighting, power supply, communications, alarm and fire suppression systems
Ministry of Construction
Building repair, interior finishing and landscaping
Ministry of Construction
International occupational health and safety management system
Since 2018
Let’s talk about your project
We will prepare a preliminary estimate of scope, schedule and budget.
- Address
- Building 3, Door 7, 11th Khoroo,
Khan-Uul District, Ulaanbaatar, Mongolia - info@virtualsoft.mn
Fax: +976 7000-5554
